UNKNOWN107838

Substation-Adjacent

Union County, Arkansas · MISO

DC Readiness
60.3
Good / 100

UNKNOWN107838 is a substation-adjacent datacenter candidate site in Union County, Arkansas, interconnecting through MISO. It screens at 60.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN107838
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPARE-ON Hope
IXP distance62.6 mi
Fiber providers5
Fiber coverage27.0%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance236.0 mi

Site characteristics

Parcel ownerJel Real Estate Llc
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index87.2 (avg 100)

Location context

Nearest datacenterARE-ON Hope
DC distance62.6 mi
Nearest rail2.8 mi
Nearest gas pipeline2.3 mi
Nearest fiber route133.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.74¢/kWh
Industrial electricity7.18¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$2,912

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
48
Fiber connectivity12%
55
Energy cost10%
95
Water risk8%
84
Natural hazard8%
62
Buildability7%
70
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
77
Gas pipeline2%
93
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Union County, ranked by DC Readiness.

Sites near UNKNOWN107838
SiteTypeVoltageCapacityQueue waitScore
UNION POWER STATIONSubstation-Adjacent500 kV1,000 MW1.4 yrs70.9
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs64.3
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs64.2
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs63.9
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs63.9
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs63.6
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs63.0
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN107838, Union County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.