Datacenter Sites in District of Columbia, District of Columbia

District of Columbia has 91 scored datacenter candidate sites averaging 54.1/100 DC Readiness, with a catalogued aggregate of 2,622 MW. FEMA rates local natural-hazard risk as "Very Low". The county has a datacenter tax incentive on record.

91
Candidate sites
54.1/100
Avg DC Readiness
2,622 MW
Catalogued capacity
theoretical aggregate
Very Low
Hazard rating

Site-selection context for District of Columbia

Yestax_credits
Datacenter tax incentive
13.52¢/kWh
Commercial electricity
1.89¢/kWh
Industrial electricity
15
Fiber providers
Low-Medium
Water stress
Land price / acre
1,500
Cooling degree days
4,200
Heating degree days
57°F
Mean annual temp

Incentive detail: Technology sector tax incentives; Qualified High Technology Company (QHTC) credits.

By site type

Top datacenter sites in District of Columbia

Top datacenter sites in District of Columbia
SiteTypeVoltageCapacityQueue waitScore
BUZZARD POINTSubstation-Adjacent230 kV300 MW3.1 yrs75.5
TOKOMASubstation-Adjacent230 kV300 MW3.1 yrs74.7
BENNING (230KV)Substation-Adjacent230 kV300 MW3.1 yrs74.5
O STSubstation-Adjacent138 kV100 MW3.1 yrs72.0
ALABAMA AVENUESubstation-Adjacent230 kV300 MW3.1 yrs71.7
METZEROTT ROADSubstation-Adjacent230 kV300 MW3.1 yrs71.5
BLADENSBURGSubstation-Adjacent115 kV100 MW3.1 yrs71.4
BENNING (69KV)Substation-Adjacent115 kV100 MW3.1 yrs71.4
PEPCO HARVARDSubstation-Adjacent115 kV100 MW3.1 yrs71.1
TUXEDOSubstation-Adjacent115 kV100 MW3.1 yrs70.0
VAN NESSSubstation-Adjacent138 kV100 MW3.1 yrs69.9
BETHESDASubstation-Adjacent138 kV100 MW3.1 yrs69.7
UNKNOWN162145Substation-Adjacent115 kV100 MW3.1 yrs69.3
UNKNOWN123341Substation-Adjacent115 kV100 MW3.1 yrs69.2
WILDERCROFTSubstation-Adjacent115 kV100 MW3.1 yrs68.4
TENTH STSubstation-Adjacent138 kV100 MW3.1 yrs67.5
OZ District of ColumbiaGreenfield3.1 yrs66.7
EC Coal District of ColumbiaGreenfield3.1 yrs66.6
OZ District of ColumbiaGreenfield3.1 yrs66.5
OZ District of ColumbiaGreenfield3.1 yrs66.4
OZ District of ColumbiaGreenfield3.1 yrs66.3
OZ District of ColumbiaGreenfield3.1 yrs65.8
NIH Cogeneration FacilityBrownfield22 MW3.5 yrs63.8
OZ District of ColumbiaGreenfield3.1 yrs63.7
OZ District of ColumbiaGreenfield3.1 yrs61.8

District of Columbia datacenter FAQ

How many datacenter sites are in District of Columbia?
91 scored datacenter candidate sites, averaging 54.1/100 DC Readiness.
Does District of Columbia offer datacenter tax incentives?
Technology sector tax incentives; Qualified High Technology Company (QHTC) credits.
What is the natural-hazard risk in District of Columbia?
FEMA's National Risk Index rates District of Columbia as "Very Low" (score 12).
What are industrial electricity rates in District of Columbia?
Average industrial electricity is 1.89¢/kWh and commercial is 13.52¢/kWh in District of Columbia.

Dataset updated . Screening estimates derived from public data sources.