EC Near Medical Area Total Energy Plant

Greenfield

Suffolk County, Massachusetts · ISO-NE

DC Readiness
59.5
Good / 100

EC Near Medical Area Total Energy Plant is a greenfield datacenter candidate site in Suffolk County, Massachusetts, interconnecting through ISO-NE. It screens at 59.5/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneISONE_MA
Wholesale LMP$69.64/MWh
Utility commercial rate0.18¢/kWh

Speed to power

ISO / RTO regionISO-NE
Queue depth32
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPLightWave Networks
IXP distance2.4 mi
Fiber providers7
Fiber coverage40.5%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance398.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerWain Charles A
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usenear retired oil plant (10km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteKENNETH GORDON
Hazard sub-score68/100
Construction cost index124.3 (avg 100)

Location context

Nearest datacenterDigital Realty BOS (105 Cabot)
DC distance2.4 mi
Nearest rail0.9 mi
Nearest gas pipeline1.1 mi
Nearest fiber route55.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity17.62¢/kWh
Industrial electricity16.73¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$52,340

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
37
Fiber connectivity12%
84
Energy cost10%
63
Water risk8%
91
Natural hazard8%
68
Buildability7%
92
Labor market4%
50
DC cluster4%
100
Land / acreage3%
38
Construction cost3%
46
Gas pipeline2%
97
Tax incentive2%
0
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Suffolk County, ranked by DC Readiness.

Sites near EC Near Medical Area Total Energy Plant
SiteTypeVoltageCapacityQueue waitScore
KINGSTON STREETSubstation-Adjacent345 kV600 MW3.5 yrs72.2
K STREETSubstation-Adjacent345 kV600 MW3.5 yrs71.1
NORTH CAMBRIDGESubstation-Adjacent345 kV600 MW3.5 yrs70.6
GOLDEN HILLSSubstation-Adjacent345 kV600 MW3.5 yrs70.4
MYSTICSubstation-Adjacent345 kV600 MW3.5 yrs70.1
WAKEFIELD JUNCTIONSubstation-Adjacent345 kV600 MW3.5 yrs69.5
Mystic Generating StationBrownfield2,844 MW3.5 yrs66.9
WOBURNSubstation-Adjacent345 kV600 MW3.5 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.