Greenfield (KEYSTONE - LUDINGTON)

Greenfield

Wexford County, Michigan · MISO

DC Readiness
60.1
Good / 100

Greenfield (KEYSTONE - LUDINGTON) is a greenfield datacenter candidate site in Wexford County, Michigan, interconnecting through MISO. It screens at 60.1/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationKEYSTONE
Substation voltage345 kV
Available capacity600 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEthoplex Edge DC - Green Bay
IXP distance104.0 mi
Fiber providers5
Fiber coverage34.2%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance195.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerWOLVERINE POWER SUPPLY COOP
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index66.7 (avg 100)

Location context

Nearest datacenterEthoplex Edge DC - Green Bay
DC distance104.0 mi
Nearest rail10.7 mi
Nearest gas pipeline0.3 mi
Nearest fiber route122.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity11.18¢/kWh
Industrial electricity7.16¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$3,918

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
47
Fiber connectivity12%
53
Energy cost10%
84
Water risk8%
91
Natural hazard8%
65
Buildability7%
15
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
94
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Wexford County, ranked by DC Readiness.

Sites near Greenfield (KEYSTONE - LUDINGTON)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN145744Substation-Adjacent138 kV100 MW2.2 yrs64.2
C W TIPPYSubstation-Adjacent138 kV100 MW2.2 yrs63.8
EC FFE Wexford CountyGreenfield2.2 yrs61.5
TAP145688Substation-Adjacent138 kV100 MW2.2 yrs61.3
Greenfield (TIPPY DAM - TAP145688)Greenfield138 kV100 MW2.2 yrs61.1
Greenfield (UNKNOWN145744 - KEYSTONE)Greenfield138 kV100 MW2.2 yrs60.9
Greenfield (UNKNOWN145744 - KEYSTONE)Greenfield138 kV100 MW2.2 yrs60.8
TIPPY DAMSubstation-Adjacent138 kV100 MW2.2 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (KEYSTONE - LUDINGTON), Wexford County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.