EC Near Batesville Generation Facility

Greenfield

PANOLA, Mississippi · MISO

DC Readiness
60.5
Good / 100

EC Near Batesville Generation Facility is a greenfield datacenter candidate site in PANOLA, Mississippi, interconnecting through MISO. It screens at 60.5/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth13
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance44.8 mi
Fiber providers5
Fiber coverage62.6%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance410.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerAlta Vista Farms Lp
Parcel APN1135 1500000 0002600
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay
Former usenear retired gas plant (5km)

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index80.5 (avg 100)

Location context

Nearest datacenterxAI Macrohardrr
DC distance42.8 mi
Nearest rail0.4 mi
Nearest gas pipeline1.1 mi
Nearest fiber route192.8 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.60¢/kWh
Industrial electricity7.22¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,142

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
59
Fiber connectivity12%
68
Energy cost10%
90
Water risk8%
91
Natural hazard8%
55
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
83
Gas pipeline2%
96
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in PANOLA, ranked by DC Readiness.

Sites near EC Near Batesville Generation Facility
SiteTypeVoltageCapacityQueue waitScore
BATESVILLE GENERATION FACILITYSubstation-Adjacent230 kV300 MW1.4 yrs71.5
Batesville Generation FacilityBrownfield292 MW70.6
BATEVILLESubstation-Adjacent230 kV300 MW1.4 yrs66.8
N. SARDISSubstation-Adjacent115 kV100 MW1.4 yrs64.4
UNKNOWN169491Substation-Adjacent161 kV100 MW1.4 yrs63.9
TAP149958Substation-Adjacent161 kV100 MW1.4 yrs63.2
Greenfield (UNKNOWN111260 - BATEVILLE)Greenfield230 kV300 MW1.4 yrs63.2
UNKNOWN110930Substation-Adjacent115 kV100 MW1.4 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Batesville Generation Facility, PANOLA. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.