Datacenter Sites in WEBSTER, Mississippi

WEBSTER has 14 scored datacenter candidate sites averaging 55.0/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

14
Candidate sites
55.0/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for WEBSTER

Yessales_tax_exemption
Datacenter tax incentive
12.38¢/kWh
Commercial electricity
8.23¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$2,215
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in WEBSTER

Top datacenter sites in WEBSTER
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109627Substation-Adjacent161 kV100 MW1.4 yrs69.2
TAP144783Substation-Adjacent161 kV100 MW1.4 yrs67.6
EUPORASubstation-Adjacent161 kV100 MW1.4 yrs64.2
DERMASubstation-Adjacent161 kV100 MW1.4 yrs63.9
Greenfield (UNKNOWN109627 - TAP144783)Greenfield161 kV100 MW1.4 yrs61.5
Greenfield (DERMA - EUPORA)Greenfield161 kV100 MW1.4 yrs60.3
SLY, INC. (AIR PURIFICATION EQUIPMENT MANUFACTURING)Manufacturing49.9
EDWARDS FABRICATION & WELDING, B. K. (MACHINE SHOPS)Manufacturing49.6
HAWKEYE GLOVE MFG., INC. (NOT AVAILABLE)Manufacturing48.2
DIXIE CRAFT TRAILERS, INC. (TRAVEL TRAILER AND CAMPER MANUFACTURING)Manufacturing48.2
ROSEBURG FOREST PRODUCTS CO. (SAWMILLS)Manufacturing48.0
PLYMOUTH TUBE CO. (FLUID POWER VALVE AND HOSE FITTING MANUFACTURING)Manufacturing48.0
Wood CollegeIndustrial46.1
Garan PropertyIndustrial45.4

WEBSTER datacenter FAQ

How many datacenter sites are in WEBSTER?
14 scored datacenter candidate sites, averaging 55.0/100 DC Readiness.
Does WEBSTER offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in WEBSTER?
FEMA's National Risk Index rates WEBSTER as "Relatively High" (score 45).
What are industrial electricity rates in WEBSTER?
Average industrial electricity is 8.23¢/kWh and commercial is 12.38¢/kWh in WEBSTER.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WEBSTER, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.