SLY, INC. (AIR PURIFICATION EQUIPMENT MANUFACTURING)
ManufacturingWEBSTER, Mississippi
SLY, INC. (AIR PURIFICATION EQUIPMENT MANUFACTURING) is a manufacturing datacenter candidate site in WEBSTER, Mississippi. It screens at 49.9/100 DC Readiness.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in WEBSTER, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN109627 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 69.2 |
| TAP144783 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 67.6 |
| EUPORA | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 64.2 |
| DERMA | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 63.9 |
| Greenfield (UNKNOWN109627 - TAP144783) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 61.5 |
| Greenfield (DERMA - EUPORA) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 60.3 |
| EDWARDS FABRICATION & WELDING, B. K. (MACHINE SHOPS) | Manufacturing | — | — | — | 49.6 |
| HAWKEYE GLOVE MFG., INC. (NOT AVAILABLE) | Manufacturing | — | — | — | 48.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.