UNKNOWN117964

Substation-Adjacent

Adair, Missouri · MISO

DC Readiness
64.8
Good / 100

UNKNOWN117964 is a substation-adjacent datacenter candidate site in Adair, Missouri, interconnecting through MISO. It screens at 64.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117964
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth21
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPConnect Des Moines
IXP distance112.9 mi
Fiber providers5
Fiber coverage77.5%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance122.3 mi

Site characteristics

Parcel ownerUNION ELECTRIC CO - (MO)
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteBUCKS AUTO BODY TOWING LLC
Hazard sub-score52/100
Construction cost index76.1 (avg 100)

Location context

Nearest datacenterCenturyLink
DC distance79.2 mi
Nearest rail9.5 mi
Nearest gas pipeline30.9 mi
Nearest fiber route60.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.58¢/kWh
Industrial electricity7.49¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,098

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
54
Fiber connectivity12%
65
Energy cost10%
85
Water risk8%
91
Natural hazard8%
52
Buildability7%
100
Labor market4%
50
DC cluster4%
25
Land / acreage3%
49
Construction cost3%
87
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Adair, ranked by DC Readiness.

Sites near UNKNOWN117964
SiteTypeVoltageCapacityQueue waitScore
EC Near KirksvilleGreenfield1.4 yrs57.8
EC Near KirksvilleGreenfield1.4 yrs57.2
La PlataBrownfield4 MW1.4 yrs56.9
EC Near KirksvilleGreenfield1.4 yrs56.9
EC Near KirksvilleGreenfield1.4 yrs56.7
OZ AdairGreenfield1.4 yrs56.5
EC Near KirksvilleGreenfield1.4 yrs56.2
KirksvilleBrownfield15 MW1.4 yrs56.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN117964, Adair. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.