PORTLAND STATION

Substation-Adjacent

Warren County, New Jersey · PJM

DC Readiness
61.3
Good / 100

PORTLAND STATION is a substation-adjacent datacenter candidate site in Warren County, New Jersey, interconnecting through PJM. It screens at 61.3/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPORTLAND STATION
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_PECO
Wholesale LMP$38.56/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth411
Avg queue wait3.0 yrs
Recent queue wait1.6 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPPlanet Networks Newton Datacenter
IXP distance18.0 mi
Fiber providers9
Fiber coverage25.7%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance182.7 mi

Site characteristics

Parcel ownerMETROPOLITAN EDISON CO
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score47/100
Construction cost index94.6 (avg 100)

Location context

Nearest datacenterPlanet Networks Newton Datacenter
DC distance18.0 mi
Nearest rail3.6 mi
Nearest gas pipeline8.4 mi
Nearest fiber route96.2 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.50¢/kWh
Industrial electricity8.31¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$13,941

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
42
Fiber connectivity12%
54
Energy cost10%
85
Water risk8%
87
Natural hazard8%
47
Buildability7%
15
Labor market4%
50
DC cluster4%
65
Land / acreage3%
32
Construction cost3%
71
Gas pipeline2%
73
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Warren County, ranked by DC Readiness.

Sites near PORTLAND STATION
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN123653Substation-Adjacent230 kV300 MW3.0 yrs74.7
UNKNOWN123651Substation-Adjacent230 kV300 MW3.0 yrs71.1
YARDS CREEKSubstation-Adjacent230 kV300 MW3.0 yrs69.8
Greenfield (UNKNOWN132619 - LACKAWANNA)Greenfield500 kV1,000 MW3.0 yrs69.6
UNKNOWN132943Substation-Adjacent230 kV300 MW3.0 yrs68.9
Greenfield (UNKNOWN132619 - BRANCHBURG)Greenfield500 kV1,000 MW3.0 yrs68.5
UNKNOWN132605Substation-Adjacent230 kV300 MW3.0 yrs67.4
UNKNOWN132303Substation-Adjacent230 kV300 MW3.0 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PORTLAND STATION, Warren County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.