HIGHWAY EIGHT
Substation-AdjacentOneida, Wisconsin · MISO
HIGHWAY EIGHT is a substation-adjacent datacenter candidate site in Oneida, Wisconsin, interconnecting through MISO. It screens at 59.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Oneida, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| THREE LAKES | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.3 |
| CLEAR LAKES (WPS) | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 62.6 |
| VENUS | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 62.5 |
| EC Near Rhinelander Mill | Greenfield | — | — | 1.4 yrs | 60.0 |
| RHINELANDER PAPER | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 59.7 |
| Rhinelander Mill | Brownfield | — | 4 MW | — | 59.7 |
| HIGHWAY EIGHT | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 59.1 |
| Greenfield (HIGHWAY EIGHT - TAP139528) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 58.9 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for HIGHWAY EIGHT, Oneida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.