RHINELANDER PAPER

Substation-Adjacent

Oneida, Wisconsin · MISO

DC Readiness
59.7
Good / 100

RHINELANDER PAPER is a substation-adjacent datacenter candidate site in Oneida, Wisconsin, interconnecting through MISO. It screens at 59.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationRHINELANDER PAPER
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth41
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXP901 Commerce Dr
IXP distance78.6 mi
Fiber providers4
Fiber coverage34.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance274.8 mi

Site characteristics

Parcel ownerNORTHERN STATES POWER CO
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former usegas
Existing capacity4 MW
Retirement date2012-12-01

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteAHLSTROM RHINELANDER LLC
Hazard sub-score53/100
Construction cost index82.5 (avg 100)

Location context

Nearest datacenter901 Commerce Dr
DC distance78.6 mi
Nearest rail0.1 mi
Nearest gas pipeline1.7 mi
Nearest fiber route93.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.28¢/kWh
Industrial electricity7.45¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,553

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
49
Fiber connectivity12%
15
Energy cost10%
85
Water risk8%
92
Natural hazard8%
53
Buildability7%
95
Labor market4%
50
DC cluster4%
20
Land / acreage3%
54
Construction cost3%
81
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Oneida, ranked by DC Readiness.

Sites near RHINELANDER PAPER
SiteTypeVoltageCapacityQueue waitScore
THREE LAKESSubstation-Adjacent115 kV100 MW1.4 yrs63.3
CLEAR LAKES (WPS)Substation-Adjacent115 kV100 MW1.4 yrs62.6
VENUSSubstation-Adjacent115 kV100 MW1.4 yrs62.5
EC Near Rhinelander MillGreenfield1.4 yrs60.0
Rhinelander MillBrownfield4 MW59.7
HIGHWAY EIGHTSubstation-Adjacent115 kV100 MW1.4 yrs59.5
HIGHWAY EIGHTSubstation-Adjacent115 kV100 MW1.4 yrs59.1
Greenfield (HIGHWAY EIGHT - TAP139528)Greenfield115 kV100 MW1.4 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.